Malagarasi Hydroelectric Power Station

Malagarasi Hydroelectric Power Station, is a planned 50 megawatts (67,000 hp) hydroelectric power station in Tanzania. The development is planned in the Igamba area, west of the Malagarasi swamps, at the site of the Igamba Falls.[1]

Hydroelectric power station in Tanzania

Dam in Igamba Falls, Malagarasi River, Kigoma Region

Malagarasi Hydroelectric Power Station

Map of Tanzania showing the location of Malagarasi Hydroelectric Power Station
Country Tanzania
Location Igamba Falls, Malagarasi River, Kigoma Region
Coordinates

05°10′43″S30°03′49″E

Status Proposed
Owner(s) Tanesco
Dam and spillways
Impounds Malagarasi River
Reservoir
Normal elevation 1,200 m (3,900 ft)
Commission date TBD
Type Run-of-the-river
Installed capacity 50 MW (67,000 hp)

. . . Malagarasi Hydroelectric Power Station . . .

The power station would be located on the Malagarasi River, west of the Malagarasi swamps, in the area called Igamba. This location is the location of the Igamba Falls, where the power station would be located. This location lies approximately 100 kilometres (62 mi), by road, southeast of the regional capital of Kigoma.[1]

Malagarasi Hydropower Station is intended to add 50 megawatts to the Tanzanian national electricity grid and to supply sustainable, renewable, green energy to the city of Kigoma and surrounding communities, including Uvinza, Kasulu and Buhigwe, which obtain their electricity from diesel sources. Any surplus electricity from this power station will be integrated into the national grid at an electric substation at Kidahwe, a suburb of Kigoma. A new 53 kilometres (33 mi) 132kV high voltage power line from the new power station to the substation at Kidahwe, is a component of this project.[1][2]

According to the African Development Bank, the project has these additional benefits: 1. It will create approximately 700 jobs during the construction phase 2. It will reduce production costs of electricity in the Kigoma Region from US$0.33 to about US$0.04 per kilowatt-hour 3. It will reduce the use of fossil fuels and the attendant emission of greenhouse gases and 4. The cost of doing business is expected “to reduce because the industry will no longer need to maintain expensive back-up generators”.[3]

As of November 2020, the total construction budget was US$144.14 million. The table below illustrates the sources of funding for the project.[3] The loan documents were executed between the AfDB and the government of Tanzania, on 28 May 2021. [2][4]

Malagarasi Hydroelectric Power Station Funding
Rank Development Partner US Dollars Invested Percentage Notes
1 African Development Bank 120.0 million 83.25 Loan
2 African Growth and Opportunity Fund 20.0 million 13.88 Loan
3 Government of Tanzania 4.14 million 2.87 Equity Investment
Total 144.14 million 100.00

. . . Malagarasi Hydroelectric Power Station . . .

This article is issued from web site Wikipedia. The original article may be a bit shortened or modified. Some links may have been modified. The text is licensed under “Creative Commons – Attribution – Sharealike” [1] and some of the text can also be licensed under the terms of the “GNU Free Documentation License” [2]. Additional terms may apply for the media files. By using this site, you agree to our Legal pages . Web links: [1] [2]

. . . Malagarasi Hydroelectric Power Station . . .

Previous post Jennifer Byrne Presents
Next post .55 Boys